Search Results
- Construction Schedule
-
Structure
-

Wind Blocking Unit
Blocks wind and prevents the scattering of welding sparks to ensure safety!
-

LB Mat
Works under any conditions
Being lightweight, it significantly reduces the labor required for laying and clearing, while ensuring safety on slabs during concrete placement.
-

Amenbo MK-1
Scaffolding for piping during concrete placement
・Urethane rollers absorb vibrations during concrete pumping, reducing the load on reinforcing bars and floor decks.
