Genchi Double-step
Handling Locations
*Click to go to Locations page
Genchi Double-step
Work scaffolding exclusively for manholes. A great product that can do two things in one, allowing you to adjust the length just by changing the direction.
Features
-
Long installation
Scaffolding dimensions 630mm
If there are no large manholes or obstacles, use the longer side as a foothold. -
When installing a short
Scaffolding dimensions 360mm
If there is an obstacle in the No. 1 manhole or tank, use the shorter side as a foothold. -
Useful for many tasks inside manholes
- Please use it by hanging it on the ramp installed inside the manhole.
- The upper hook supports the load, and the lower hook prevents it from swinging.
- Please make sure that both are attached to the step before use.
Specification
Genchi Double-step
Model | Installation orientation: long | Installation direction Short |
---|---|---|
Width mm | 220 | 220 |
Length mm | 753 | 483 |
Height mm | 483 | 753 |
Mass (kg) | 8.0 | 8.0 |
Allowable load kN (kgf) | 1.47 (150) | 1.47 (150) |